Ecosistemaexpand_more
Informaciónexpand_more
Funcionesexpand_more
Cría por especieexpand_more
Pavos — guíaexpand_more
Pollos (engorde)expand_more
Calculadorasexpand_more
Conceptos básicos y documentaciónexpand_more
Gripe aviar y Newcastle (ND)expand_more
Enfermedades productivasexpand_more
Microclima y naveexpand_more
Higiene y desinfecciónexpand_more
Bienestar animal y ayudasexpand_more
Transporte y sacrificioexpand_more
Normativa y medio ambienteexpand_more
Bioseguridad y bienestarexpand_more
Incubación y huevoexpand_more
Equipamiento y mecanizaciónexpand_more
Comparativasexpand_more
IA, sensores y monitorizaciónexpand_more
Evaluación y selección de avesexpand_more
Certificacionesexpand_more
Equipos e instalacionesexpand_more
Innovación y la granja del futuroexpand_more
Ferias y eventosexpand_more
Alimentación y luzexpand_more
Precios de compraexpand_more
Gripe aviar por voivodatoexpand_more
Precios de compra por voivodatoexpand_more
paymentsPrecios
Herramientasexpand_more
Subvencionesexpand_more
Novedadesexpand_more
Investigaciónexpand_more
Precios→
Empresaexpand_more

Únete ahoraIniciar sesión
Tool

Farm planner

A list of buildings, equipment and formalities for a new farm in Poland, with quantities calculated from your parameters and a step-by-step guide.

verifiedDel equipo que lleva años organizando el trabajo en granjas avícolas.

5 farm typesNo prices or brandsLegal status 22.11.2026PDF by e-mail
Planificador de granja

Planifica tu granja: edificios, equipamiento, trámites

Elige el tipo de granja e indica la escala. En el navegador calculamos un resumen completo con cantidades: edificios, equipamiento, sensores, documentos, oficinas, empresas y contratos, además de una guía paso a paso. Sin precios ni nombres de fabricantes. Puedes recibir el resumen en PDF por correo electrónico.

¿Qué granja estás planificando?

Building a farm means a dozen or so decisions in several offices and dozens of equipment items. The planner gathers them in one summary: from the local zoning plan extract, through the environmental decision and the building permit, to the number of feeders, fans, sensors and silos. We calculate quantities from the building dimensions and stocking, following standards from breeding manuals and regulations.

How to build a farm — step by step

  1. 1

    Plot and local zoning plan

    Check with the municipality (gmina) whether the plot has a local zoning plan that allows livestock buildings. Without a plan you need a decision on planning conditions (WZ), and from 1.09.2026 it is issued only in a municipality with a general plan.

  2. 2

    Environmental decision

    Calculate livestock units (LU, Polish DJP) from the maximum stocking. A farm of 210 LU or more always needs a decision with an EIA report; from 40 or 60 LU, depending on location. The decision is issued by the village head (wójt) or mayor.

  3. 3

    Financing

    Check ARiMR (Agency for Restructuring and Modernisation of Agriculture) calls, preferential loans and guarantees before you sign contracts. A grant application is usually filed before the investment starts.

  4. 4

    Design and utility connections

    The designer prepares a design with the distances of tanks and manure plates. Apply for connection conditions for electricity, gas and water; with a well abstracting more than 5 m³ per day, also for a water-law permit.

  5. 5

    Building permit

    A poultry house, piggery and cattle barn require a building permit from the district office (starostwo). A manure plate, a slurry tank and a feed silo up to 250 m³ usually need only a notification. Large poultry and pig farms also need an integrated permit.

  6. 6

    Construction and acceptance

    Construction log, site manager, notice of start of works. After completion you notify PINB (district building control), which has 14 days to object.

  7. 7

    Registrations

    Producer number at ARiMR, registration of the establishment with PIW (district veterinary inspectorate) and the WNI number, within 14 days the herd holding number in IRZplus. Mandatory farmer's liability insurance and building insurance.

  8. 8

    Contracts and first placement

    Contracts with the buyer, feed mill, animal supplier, veterinarian and rendering plant. Before stocking, a biosecurity plan; after placement, reports within 7 days.

Preguntas frecuentes

Does a poultry house or piggery need a building permit?add

Yes. Polish Construction Law exempts only some farm outbuildings and sheds from the permit, and a livestock building is not one of them. A manure plate and a sealed slurry tank usually need only a notification. Confirm the procedure for your case with the district office.

From how many animals is an environmental decision needed?add

What counts is LU from the maximum stocking: hens 0.004 LU per head, turkeys 0.024, fattening pigs 0.14. From 210 LU (approx. 52,500 hens or 1,500 fattening pigs) a decision with a report is always required. From 40 LU close to housing or from 60 LU elsewhere, a decision without a report, unless the municipality requests one.

When does a farm need an integrated permit?add

When it has more than 40,000 poultry places, 2,000 fattening pig places or 750 sow places. The permit is issued by the district head (starosta), and for a farm of 210 LU or more by the voivodeship marshal.

Where do the quantities in the summary come from?add

From the building dimensions and stocking, and from standards: the directives on the protection of broilers, laying hens and pigs, the Polish regulation on minimum keeping conditions, and the manuals of Ross, Aviagen Turkeys, Hy-Line, PIC, Topigs Norsvin, Teagasc and IZ PIB. Every rule has its source stated in the code.

Why does the summary have no prices or manufacturer names?add

Prices change every few weeks and depend on the supplier. The summary is meant for talking to the designer and suppliers, and each of them prepares a price quote separately.

Is my data sent anywhere?add

The summary is calculated in your browser. You send data only if you want to receive the PDF by e-mail. In that case we store the request in our database to prepare and send the file.